Safety features, Installation instructions (s7999b oi display), Mounting the s7999b oi display and power supply – Honeywell Local Operator Interface S7999B User Manual

Page 4: Wiring (s7999b oi display), Warning

Advertising
background image

S7999B, S7999C SOLA LOCAL OPERATOR INTERFACE

65-0303—05

4

required to correct the interference at his own expense.

This Class A digital apparatus complies with Canadian ICES-003.

Cet Appareil numérique de la classe A est conforme à la norme NMB-003 du Canada.

SAFETY FEATURES

The OI Displays contain software that incorporates many

features that are designed to guide you safely through the

commissioning process. Safety, however, is your responsibility.

Read all documentation carefully and respond appropriately to

all error messages.

WARNING

Explosion Hazard.

Improper configuration can cause fuel buildup and

explosion.

Improper user operation may result in PROPERTY

LOSS, PHYSICAL INJURY or DEATH.

Using the OI Displays to change parameters, must be

attempted by only experienced and/or licensed

burner/boiler operators and mechanics.

INSTALLATION INSTRUCTIONS
(S7999B OI DISPLAY)

NOTE: For S7999C OI Display installation instructions, see

page 9.

Mounting the S7999B OI Display and
Power Supply

The OI Display can be mounted on the door panel of an

electrical enclosure.

1. Select the location on the door panel to mount the dis-

play; note that the device will extend into the enclosure

at least one inch past the mounting surface.

2. Provide an opening in the panel door 8-1/8 in. wide by 5-

7/8 in. high.

3. Place the OI Display in the opening and use it as a tem-

plate to mark the location of the four mounting screw

holes. Remove the device.

4. Using pilot holes as guides, drill 1/4 in. holes through the

door panel.

5. Place the display in the opening, aligning the mounting

holes in the device with the drilled holes in the panel.

6. Secure the display to the panel with four #6-32 screws

and nuts provided.

Fig. 2. S7999B OI Display connector terminals.

7. Select a location inside the enclosure for mounting the

power supply.

8. Using the power supply as a template, mark the loca-

tions of the two mounting holes in the enclosure.

9. Remove the power supply.

10. Drill 1/4 in. holes through the panel at the marked loca-

tions and secure the power supply with the two #6-32

screws and nuts provided.

11. Remove the 9-pin connector plug from the back of the OI

Display.

12. Wire the connector to the power supply and the RS-485

cables using the wiring diagram in Fig. 3.

13. Ensure the 9-pin connector plug is aligned with the

header pins when inserting the 9-pin connector plug

back onto the Display. Secure firmly.

WIRING (S7999B OI DISPLAY)

The S7999B OI Display must be appropriately wired for both

power and communications. An external 12V power supply

(provided) with an appropriate power rating is connected to

pins 1, 2 and 3 to power the device.

Communication is done over a RS-485 bus:

• COM1 connected directly to the SOLA Device J3 connector

to either Modbus (MB1 or MB2).

• COM2: A bus to the Building Automation System.

See Fig. 2 for S7999B Display connector terminals. Wiring

connections are listed in Table 1. See Fig. 3 for wiring.

Table 1. 9-pin Connector Terminals

Pin #

Function

1

12V input

2

12V input

3

Common (Power, COM 1)

4

COM 1 (b) to MB1 or MB2 terminal

5

COM 1 (a) to MB1 or MB2 terminal

6

Not used

7

Not used

8

COM 2 (a)

1 2 3 4 5 6 7 8 9

M28859A

COMMON (c)

COM1 (b)

COM1 (a)

N/C

N/C

COM2 (a)

COM2 (b)

+12V

Advertising