Preparation before operation, Installation, Releasing the locking pin – Hitachi C 10FS User Manual

Page 11

Advertising
background image

11

English

PREPARATION BEFORE OPERATION

Make the following preparations before operating the power tool:

1. Installation

Fig. 4

Attach the power tool to a level, horizontal work bench in accordance with Fig. 4.
Select 5/16" (8mm) diameter bolts suitable in length for the thickness of the work bench.
Bolt length should be at least 1" (25mm) plus the thickness of the work bench.
For example, use 2" (50mm) or larger bolts for a 1" (25mm) thick work bench.
The holder attached to the rear of the base helps stabilize the power tool.

Base holder adjustment:
Loosen the 6mm bolt with the supplied 10mm box wrench.
Adjust the base holder until its bottom surface contacts the work
bench surface.
After adjustment, firmly tighten the 6mm bolt.

Fig. 5

2. Releasing the locking pin

Fig. 6-a

Fig. 6-b

When the power tool is prepared for shipping, its main parts are secured by a locking pin.
Move the handle (see Fig. 1) slightly so that the locking pin can be disengaged and adjusted as indicated
in Fig. 6-b.

NOTE:

Lowering the handle (see Fig. 1) slightly will enable you to disengage the locking pin more
easily and safely.
The lock position of the locking pin is for carrying and storage only.

11/32" (9mm)
3 Holes

11-13/16" (300mm)

5-29/32" (150mm)

10-13/32" (264mm)

1" (25mm) thick bench

Work Bench

5/16" (8mm) Nut

5/16" (8mm) Bolt

Base

During transport, fit the pin into the
deep slot.
NOTE: This position is not be used

for any cutting operation.

Locking Pin

During operation fit
the pin stoppers into
the shallow slot.

Pull out to disengage.
Rotate the knob 1/4 turn
and fit the pin stoppers
into the shallow slot.

Clockwise

Locking Pin

6mm Bolt

Move

Adjust the base
holder until its
bottom surface
contacts the work
bench surface.

Base Holder

Advertising