Installing the hood – FRIGIDAIRE 316488524 User Manual

Page 9

Advertising
background image

9

9

9

9

9

Installing the hood

Mounting the duct cover bracket

Mounting the duct cover bracket

Mounting the duct cover bracket

Mounting the duct cover bracket

Mounting the duct cover bracket

The duct cover bracket should be installed against
the back wall and flush with the ceiling. This bracket
will hold the telescopic duct cover in place at the top
(this a extra accessory available not included with the
hood).
.
Secur

Secur

Secur

Secur

Secure the bracket to the wall:

e the bracket to the wall:

e the bracket to the wall:

e the bracket to the wall:

e the bracket to the wall:

• Align the marked centerline on the bracket with

the centerline on the wall.

• Mark 2 screw hole locations in the wall.
• Drill 5/16" pilot holes in the marked locations.
• Install wall fastener anchors.
• Drive wood screws, by hand, into the fastener to

allow anchors to expand. Remove the screws.

• Secure the bracket to the wall with wood screws

and/or fasteners.

Vertical centerline

Ceiling

Wall

Ceiling ducting

Ceiling ducting

Ceiling ducting

Ceiling ducting

Ceiling ducting

If the duct will vent straight up to the ceiling:
• Use level to draw a line straight up, from the

centerline on the template to the ceiling.

• Measure at least 4 -3/4 ” from the back wall to

the circle center of an 8-½” hole on the ceiling.

W

W

W

W

Wall ducting

all ducting

all ducting

all ducting

all ducting

If ductwork will vent to rear:

• Use a level to draw a line straight up from the

centerline on the template.

• Measure at least 23 - 3/4" (the measure might

vary dependig on the elbow used) above the
pencil line that indicates the bottom installation
height, to the circle center of an 8-½” diameter
duct hole (Hole may be elongated for duct elbow).

House wiring location

House wiring location

House wiring location

House wiring location

House wiring location

• The junction box is located on the top left side of

the hood.

• Wiring should enter the back wall at least 20"

above the bottom of the installation height, and
within 5-7/8" and 4-7/8"of the left side of the
centerline.

Horizontal straight

pencil line

Ceiling

4-3/4" circle

center to wall

8-1/2" dia. hole

FOR CEILING VENT DUCTING

FOR

WALL

VENT

DUCT

Circle center at 23 3/4"

above the marked bottom

pencil line.

Advertising
This manual is related to the following products: