Logging – Fluke 1744 User Manual

Page 34

Advertising
background image

Power Quality Logger

Using

the

Logger

25

1. Connect the voltage test leads L2 or B and N to the common ground

point.

2. In PQ Log, select the measuring range with P-P logging and matching

nominal voltage.

3. Enter the correct converter/transformer ratio for current and voltage.

egb007.bmp

Figure 11. PQ Log Settings for a 16 kV Network

Note

Current clamp sets are available for 1 A current transformer.

Logging

When the Logger is connected and ready, you can perform three types of
logging:

Switch-activated job: The status LED is blinking. Press the

START/STOP button once. As soon as the job is active, the LED is
on continuously. If needed, the job can be cancelled after running for
at least one minute, and restarted later.