Preparing to install the freezer, Freezer location, Clearances – GE FUF12 User Manual

Page 13

Advertising
background image

Preparing to install the freezer.

ge.com

Read these instructions completely and carefully.

Freezer Location

Your freezer should be conveniently located for
day-to-day use in a dry, well-ventilated room.

Do not install the freezer where the temperature will
go below 0°F or above 110°F, because it will not
maintain proper temperatures.

Be sure to install your freezer on a floor strong
enough to support it when it is fully loaded.

The freezer must be solidly positioned on the floor
if it is to function at its best. Shims may be used to
accomplish this wherever the floor is too uneven.
If the place selected for the freezer is damp or moist,
place 2 X 4’s (51 mm X 102 mm) under its entire
length to ensure adequate support.

Clearances

On all models, allow 3

(76 mm) on top, back and

sides for proper air circulation.

Adjustable Legs

(on Upright models)

Legs at the front corners of the freezer should
be set so the freezer is firmly positioned on
the floor, and the front is raised just enough
so the door closes easily when opened about
halfway.

Turn right
to lower

Turn left
to raise

Unit Loading

(on Upright models)

CAUTION: To allow the door to close and seal
properly, DO NOT let food packages extend
past the front of the shelves.

Level Freezer

Upright Models:

Discard crate screws and wood base. Use
a carpenter’s level to level the freezer from
back to front. Adjust the plastic leveling feet
in front 1/2 bubble higher so the door closes
easily when left open.

Chest Models:

If needed, add metal or wood shims between
foot pads and floor.

Consumer

S

uppor

t

Tr

oubleshooting

Tips

Operating

Instructions

Safety

Instructions

Installation

Instructions

13

Advertising
This manual is related to the following products: