MITSUBISHI ELECTRIC TG-2000A User Manual

Page 10

Advertising
background image

7

4.3 Step 1: Test operation from centralized controller G-50A

Perform only the test operation of the air-conditioning system of the central controller G-50A.

(1) Preliminary check

Check that the test operation of the air conditioner has been completed.
Check that the central controller G-50A is set to Group and Interlock.

(The initial setting is executable using the initial setting tool or the G-50A.)










(2) Test operation from central controller G-50A

After supplying power to the central controller G-50A and all air conditioners, perform the test
operation from the central controller G-50A, and check the operation state of each unit.
* For the test operation method, refer to the installation manual for the air conditioner or the

central controller G-50A.


4.4 Step 2: Initial setting of integrated centralized control software TG-2000A

(1) Set -up of integrated centralized control software TG -2000A

Make preparations to allow the personal computer to be operative in order to install the integrated
centralized control software TG -2000A. After performing the set-up preparations, set up the
integrated centralized control software TG -2000A.





(2) Check the G-50A IP address and personal computer (which uses the integrated centralized control

software)
Check the G-50A IP address. Check the IP address used for the integrated centralized control
software at the same time. Normally, set the sub-net to "255.255.255.0".

For a LAN dedicated to the G-50A system, it is recommended to set the IP address
within the following range.

Models

IP address range

G-50A main unit

[ 1 9 2 . 1 6 8 . 1 . 1 ] to [ 1 9 2 . 1 6 8 . 1 . 4 0 ]

Personal computer for browser

[192.168.1.101]to [ 1 9 2 . 1 6 8 . 1 . 1 4 9 ]

Personal computer

for integrated centralzed control software

[ 1 9 2 . 1 6 8 .1 . 1 5 0 ]

PLC

[192.168.1.151]to [ 1 9 2 . 1 6 8 . 1 . 2 0 0 ]

Personal computer of initial setting tool

[ 1 9 2 . 1 6 8 . 1 . 2 0 1 ]

* To connect to the existing LAN, set the IP address and sub-net mask set by the LAN manager.

(3) LAN connection confirmation

Check that the LAN cable is connected to the G-50A, personal computer (using integrated
software), and hub, and that power is supplied to the hub.

(4) Initial setting of integrated centralized control software

Start the integrated centralized control software TG -2000A to execute the initial setting.




Note:

• For the set -up procedure, refer to Chapter 5.
• For safety, check the installation state/connection before turning the power ON.

Note:

• For the initial setting method of the integrated software, refer to Chapters 6 to 8.

Power

supply unit

S tep 1

Integrated centralized

control software

TG-2000A

HUB

G-50A

Advertising