Setting check list, 1 setting check list – MITSUBISHI ELECTRIC TG-2000A User Manual

Page 81

Advertising
background image

78



11.1 Setting Check List

Follow a setting item check list according to each function you want to use.

Detail of function

Case 1

Manage groups by address

Case 2

Manage groups and blocks by name (shown by floor plan)

Case 3

Case 2 + Manage scheduling

Case 4

Case 3 + Manage air conditioner charging


Check the following items for the above cases.

Setting item

Case 1

Case 2

Case 3

Case 4

User settings

V

V

V

V

Site name settings

V

V

V

V

Set number of G-50A

V

V

V

V

G-50A
connection
setting

Set G-50A IP address

V

V

V

V

Configure unit

V

V

V

V

Set cooling system

V

V

V

V

Set the Indoor unit groups

V

V

V

V

System
configura-
tion settings

Set indoor units and ventilation
functions

V

V

V

V

Setup of unit model name

V

V

V

V

Set t he number of floors and floor
name

V

V

V

V

Create floor planes

V

V

V

V

Set the floors and G-50A units

V

V

V

V

Position and name group icons

V

V

V

V

Monitoring
setting

Set blocks

V

V

V

V

Time settings

V

V

V

V

Password change

V

V

V

V

Setting schedule (Year/Wee k )

V

V

Setting charge system

V

WHM setting *1

V

Check initial settings of charge
system setting

V

Option

*1: In charge collection without WHM connection, a setup is unnecessary.







11.Setting Check List

Note:

• To use the optional annual/weekly schedule and charge (calculation) function, it is necessary

to register the license No. to the G-50A .

• Change the password as required.

Advertising