Installation and cabling, Overview, Appendix b – McDATA ULTRANETTM EDGE STORAGE ROUTER 3000 User Manual

Page 347

Advertising
background image

B-1

B

Installation and Cabling

This appendix provides installation and cabling information for the
UltraNet Edge 3000.

Overview

The UltraNet Edge 3000 host and network I/O hardware components
have been pre-installed. You are responsible for the following:

Review the site-preparation requirements in

Appendix A, Site

Preparation

before installing the UltraNet Edge 3000 hardware.

Decide on unit placement.

Unpack and inspect the UltraNet Edge 3000 unit.

Take an inventory of UltraNet Edge 3000 components.

Ensure that ESD procedures are followed, see “Cables and
Equipment” on
page -14.

If the UltraNet Edge 3000 is placed in a rack mount, attach
mounting brackets to the front corners of the unit.

Mount UltraNet Edge 3000 on the equipment rack (or place in
tabletop position).

Acquire and attach the appropriate cable types and lengths.

NOTE:

After hardware installation is complete, use the UltraNet

ConfigManager configuration application to perform your network
configurations.

Advertising