Control box installation – Multiquip Submersible Pump ST4125G User Manual

Page 16

Advertising
background image

PAGE 16 — ST4125G/ST6125G SUBMERSIBLE PUMP • OPERATION MANUAL — REV. #0 (11/18/10)

CONTROL BOX INSTALLATION

Connecting SW-1WOPA Float Switches to Control
Box

1. Remove the fl oat switch input connector housing, then

route the fl oat switch wires through the cable gland on
the control box. Attach the wires of the fl oat switch to
the terminal block as indicated by Table 5 and Figure 9.

2. Tighten the connector housing to ensure a tight fi t

between the cord and the connector body. This will
prevent the cable from pulling out of the terminal block
and also prevent moisture from entering the control box.

3. Determine the tether length of the fl oat switch wires

then secure fl oat switch wires to pump discharge hose.
See Figure 3 and Table 2 to determine the pumping
range.

Table 5. Dual Float switch Connections

Float

Switch

Terminal

Block No.

Wire

Color

Start

TB1-A1
TB1-A2

Black

White

Stop

TB1-A3
TB1-A4

Black

White

Advertising
This manual is related to the following products: