Maintenance, Dissassembly, Caution – Ingersoll-Rand 7792-A User Manual

Page 5: Up dn

Advertising
background image

Form 10590149-Edition 2

5

Maintenance
Dissassembly
Head Disassembly

To remove head section from housing without disassembling
head components, remove head with control rod (59)
attached to gear (25). To accomplish this -

- Remove two screws (96) and housing cap (95).
- Drive out roll pin (61) and remove brake block (60).
- Drive out roll pin (69) from control arm (68).
- Remove six screws (22) and washers (23).
- Remove head section and control rod from housing as

one unit.

To disassemble head components without removing head
section from hoist:

- Remove two screws (96) and housing cap (95).
- Drive out roll pin (69) from control arm (68).
- Drive out roll pin (26) from gear (25) and drive control

rod (59) back thru gear (25) and remove gear.

- Remove adapters (19), valves (17) and (29) and valve

body (15).

- Remove set screws (24) and regulator valves (28).

CAUTION

do not attempt to adjust or remove regulator valves (28)
from spark-resistant hoist models - these valves are
pre-set at fatctory.

- Remove adapter (1) and screen (2).
- Remove retaining ring (4), swivel (3), swivel body (6)

and screen (8).

- Remove two screws (9), washers (10), exhaust

deflector (11), screen (12) and muffler filler (13).

NOTE: When reassembling head to housing a new Gasket
(31) must be installed. Tighten Screws (22) to approximately
60 in-lbs. torque. When tightening these screws it is
recommended that an air line be attached to the air inlet and
the hoist operated to insure that no binding of the motor
occurs. Tighten screws alternately and gradually until desired
torque is reached without binding of motor. Lubricate all
O-Rings with O-Ring lube (36460) before assembling. Insure
O-Ring (32) is properly positioned in head.

- Assemble valve body (15) into head - see “Timing of

Head”, this page.

- Assemble o-rings (27) to regulator valves (28).
- Assemble regulator valves (28) to head and secure

with set screws (24). NOTE: groove in regulator valve
must be aligned to accept set screw. See setting hoist
speed, page 2.

- Assemble muffler filler (13), screen (12) and exhaust

deflector (11) to head and secure with washers (10)
and screws (9).

- Clean and assemble screen (8) to head.
- Assemble o-rings (5) and (7) to swivel body (6) and

assemble body to head.

- Assemble swivel (3) to swivel body and secure with

retaining ring (4).

- Clean and assemble screen (2) and inlet adapter (1) to

swivel.

- Fill oil reservoir in head with spindle oil 29665.

Pendent Control Disassembly

- Remove pendent hoses from fittings (156) and (165).
- Remove adapter (166) from head releasing strain

cable.

- Remove screws (168), springs (170) and valves (171).

Pendent Control Assembly

- Lubricate o-rings (172) and assemble to valves (171).
- Assemble valves (171) and springs (170) to handle.
- Lubricate o-rings (169) and assemble to screws (168).
- Assemble screws (168) to handle securing valve

components.

Pendent Cylinder Disassembly

- Unthread cylinder (157) from adapter (163).

Pendent Cylinder Assembly

- Assemble piston rod (160) to piston (159).
- Lubricate and assemble o-ring (158) to piston (159).
- Lubricate and assemble o-rings (162) and (164) to

adapter (163).

Motor Disassembly

- Remove head section - see “Head Disassembly”.
- Remove motor from housing.
- Remove retaining ring (36); motor assembly will come

apart,

Motor Assembly

- Lubricate bearings (37) with NLGI #1 “EP” grease

(33153) and assemble bearings to end plate (38) and
(43) - shielded side of bearing facing out.

- Assemble end plate (43) to spindle (45) and slide up to

shoulder of spindle.

- Assemble key (44) to key slot in spindle (45).
- Assemble rotor (41) over spindle aligning key way and

key (44).

- Assemble cylinder (39) over rotor (41) and insert

blades (42) into blade slots of rotor - straight side of
blade out.

- Assemble end plate (38) to spindle and align hole in

end plate with roll pin (40).

- Secure assembled parts to spindle with retaining ring

(36).

UP DN

ENDS OF VALVE BODY FLUSH WITH BUSHING

IDENTIFICATION MARK "x" ON END OF VALVE BODY

TIMING GROOVES

ON VALVE BODY

UP DN

GEAR [25]

UP DN

STEP 1 :- POSITION HOIST SO YOU ARE FACING END WITH AIR INLET, WITH VALVE

PARTS AND GEAR [25] REMOVED, PLACE VALVE BODY IN VALVE OPENING. INSERT

FINGER IN EACH END OF VALVE OPENING AND ALIGN END OF VALVE BODY WITH ENDS

OF BUSHING.

NOTE: VALVE BODY MUST BE INSTALLED WITH IDENTIFICATION MARK AS SHOWN.

STEP 2 :- WITH BRAKE RELEASE BLOCK ASSEMBLED TO CONTROL ROD, INSERT ROD

THROUGH BRAKE END OF HOUSING, THROUGH CONTROL ARM [68] AND ON THROUGH

HOUSING STOPPING BEFORE ROD PROTRUDES FROM HEAD.

ASSEMBLE GEAR [25] TO HEAD ALIGNING CENTER TOOTH OF GEAR BETWEEN TWO

GROOVE MARKINGS ON THE VALVE BODY AS SHOWN.

ASSEMBLE CONTROL ROD THROUGH GEAR AND SECURE WITH ROLL PIN [26]. SECURE

CONTROL ARM TO ROD WITH ROLL PIN [69].

STEP 3 :- ASSEMBLE O-RINGS [16] TO VALVES [17] AND [19] AND ASSEMBLE VALVES

INTO HEAD AS SHOWN. ASSEMBLE O-RINGS [18] TO ADAPTERS [29] AND O-RINGS

[20] TO VALVE CAPS [21] AND ASSEMBLE TO HEAD.

Advertising
This manual is related to the following products: