Installation instructions & diagrams, lt-1 & lt-3 – Jackson Chemical Dispensing Unit LT-3 User Manual

Page 13

Advertising
background image

8

SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS & DIAGRAMS for the LT-1 & LT-3

1. Identify the appropriate location for the box.
2. Make sure the electrical supply to the dishmachine has been turned off at the supply circuit breaker.
3. Loosen the two screws in the upper corners of the box and open. (See diagram #1)
4. Hold the box up to the wall and mark four mounting holes. (See diagram #2)
5. Install appropriate wall anchors for the type of wall.
6. Mount the box to the wall.
7. Close the box and retighten screws.
8. Run flexible conduit to rear of dishmachine and attach with fitting provided.
9. Remove the front kick panel from the dishmachine by loosening the screws under the front two corners and lifting upward
and out.
10. Locate the wire bundle above the thermostat. There will be four wires (white, red, blue and white with a red stripe) all with
red crimp-type butt splices.
11. Run the five wires from the conduit to the front of the unit and match up color to color with the wire bundle. Cut wires from
the conduit to proper length, if needed.
12. Crimp all wires to matching color on dishmachine. Attach green and yellow wire to grounding lug. Use wire ties to route
wires out of the way of moving parts.
13. Reinstall the kick panel on the dishmachine.
14. Locate and remove the white bulkhead plug on the rear of the dishmachine.
15. Install the bulkhead fitting from the kit (bulkhead with a hole through the center) in its place. (See diagram #3) Install one
of the compression elbows into the bulkhead fitting. Route the red chemical tube into the compression elbow and hand tighten
only.
16. Locate the rinse injector on the rear of the dishmachine. Remove one of the square headed plugs. Wrap the compression
elbow threads with plumber’s teflon tape and install the elbow into the hole.
17. Insert a short piece of clear tubing from the kit into the other compression elbow. Route the white tubing from the dispenser
to the compression elbow. Insert white tube through clear tube in compression elbow and hand tighten only. (See diagram #4)
18. Power up the unit and run a cycle and check for leaks.
19. Put the unit back in place.
20. Place the gray stiffeners in the appropriate chemicals. (red for detergent, and white for sanitizer, and blue for rinse aid)
21. Prime each pump until chemical is seen flowing through tube going into the unit.
22. Installation is complete.

Diagram #1

Diagram #2

Diagram #4

Diagram #3

Advertising