Component Installation

This section pertains to the installation of the air compressor, PTO, pump and other related

items. The instructions are intended as a guide to assist you with particular installation.

These instructions will provide only general information.

Torque and Procedure Chart

Pulsation Chamber Assembly

Torque Value: 31 FT. LBS.

Procedure: See Head Installation Procedure Section

Head Assembly

Torque Value: 34 FT. LBS.

Procedure: Assemble head on the cylinder with head bolts

started only, not tight. Working in the pattern shown, torque

three times, increasing the torque each time as follows:

First Torque: 10 FT. LBS.

Second Torque: 20 FT. LBS.

Third Torque: 34 FT. LBS.

After five hours of use re-torque bolts to 34 ft-lbs.

Cylinder Assembly

Torque Value: 20 FT. LBS.

Procedure: After assembling cylinder over pistons and setting into place, tighten (6) cap

screws finger tight. In a criss-cross pattern, tighten bolts evenly so all bolts are hand snug.

Again in a criss-cross pattern torque each bolt to 20 Ft-lbs., checking each bolt twice.

After five hours of use, re-torque bolts to 20 Ft-lbs.

Connecting Rod Assembly

Torque Value: 18 FT. LBS.

Procedure: Assemble rod onto the crankshaft taking care to align the machined surfaces

together and tighten cap screws finger tight. Tighten bolts until hand tight and torque to

18 Ft-lbs. Check twice the torque reading before final assembly of the cylinders.