SSL and SSIL Series Hopper Loaders – Series One Plus Control

Reference Manual (PN: 882.00149.00) for

Complete Operation and Installation Instructions

(Available online at www.acscustomerservice.com)

Sterling

Part No: 882.00349.00

2900 S. 160

th

Street • New Berlin, WI 53151 USA

Bulletin No: CV1-335.01

Tel. 262.641.8610 • Fax 262.641.8653

Quickstart Installation Checklist

(Refer to main manual for complete installation instructions)

1. Mount hopper mounting flange to machine bin or feed throat, using rivets if possible.

2. Ensure that unit is level for proper operation.

3. Attach flex hose to unit and pickup wand. Secure it with hose clamps.

4. Attach clean, dry 80-120psi air.

5. Plug unit into grounded three-prong receptacle.



Unit Operation

(Refer to main manual for complete operating instructions)

1. Insert pickup wand into desired material.

2. Press the

START/STOP key.

Note: The hopper loader loads itself until full, then dumps and repeats.

It pauses only when the machine bin below is full.

3. To stop the unit from loading, press the

START/STOP key.


For Proportioning Models

1. Insert pickup wands into desired materials.

2. Press

SCROLL key repeatedly until screen displays “3”.

3. Press the

START/STOP/SELECT key to select the “% of MAT’L B” menu.

4. Use the

UP and

DOWN keys to set the desired % of Material B.

5. Press the

START/STOP/SELECT key to set this value.

6. Press the

START/STOP/SELECT key again to start the hopper loader.