Step 6: check the installation, Nstallation – Southbend 1184093 User Manual

Page 16

Advertising
background image

I

NSTALLATION

H

ALF

-S

IZE

E

LECTRIC

C

ONVECTION

O

VENS

P

AGE

16

O

PERATOR

S

M

ANUAL

1184093

INSTALLATION

6. Attach each supply wire to the appropriate terminal of the contactor (according to the wiring diagram).

7. Insert the ground wire into the grounding lug and tighten the screw.

8. Check that all connections match the wiring diagram and are tight.

9. Reattach the right-side panel and insulation; and the lower-front panel.

Step 6: Check the Installation

1. Check that all screws and bolts are tightened.

2. Move the oven into the position at which it will be operated.

3. Check that the oven is level. If not, adjust the legs.

4. Check that the appropriate clearances are satisfied (see page 7).

5. Turn-on supply power and check oven for proper operation.

Advertising
This manual is related to the following products: