Installation & assembly instructions – SoleusAir SG-WAC-05SM User Manual

Page 5

Advertising
background image

INSTALLATION & ASSEMBLY INSTRUCTIONS

Some assembly is required for your new air conditioner. Please read and follow these instructions carefully.

1. This air conditioner is designed to be installed in a

standard double-hung window with a window width
between 23” and 36” (584 mm - 914 mm).

2. The air conditioner can be installed without the

accordion panels to fit in a narrow window opening.
See the window dimensions.

3. The Lower Sash (the lower part of the window that

moves up and down) must allow for 14.5” of vertical
clearance when open. (See FIG. 1).

4. All supporting parts must be secured to firm wood,

masonry, or metal.

5. The electrical outlet must be within reach of the power

cord.



Top Rail Assembly

The top rail must be assembled prior to installing the air conditioner in the window
Tools Needed:
Phillips Screw Driver








Attaching the Top Rail to the Air Conditioner



5

Top Rail Hardware

QTY

4

1

3/8”

Screw

Top

Panel

1. Remove the air conditioner from the box

and place on a hard flat surface.

2. Remove top rail from the bottom of the

packaging material as shown in FIG. A

3. Align the hole in the top rail with those in

the top of the unit as shown in FIG. B

4. Secure the top rail to the unit with the 3/8"

Screws as shown in FIG. C

Top Rail

Box

FIG. A

FIG. C

FIG. B

NOTE: Save the product packaging and installation instruc-
tions for future reference. Store the air conditioner in the
product box when not in use for an extended period of time.

When handling the unit, be careful to avoid cuts from
the sharp metal edges and aluminum fins on the front
and rear coils.

FIG. 1

NOTE: For safety reasons, all 4
screws must be used to attach
the top rail.

Advertising