Maintenance schedule 5-3, Main te nance sched ule -3 – Sterling STT 160 User Manual

Page 26

Advertising
background image

5.1. Main te nance sched ule

Daily:

Check warn ing signs on equip ment for good
leg i bil ity and com plete ness

Clean re turn air fil ters and cas ing (de pend ing
on dust build-up)

Weekly:

Check main switch for proper func tion

Check the sig nal lamps for proper func tion ing

Ev ery six months:

Change re turn air fil ters (de pend ing on dust build-up)

Clean air fil ter of the suc tion box

All elec tri cal and me chan i cal con nec tions
should be checked to see if they fit se curely

An nually:

Dew point should be checked (only by
Ster ling ser vice per son nel)

When ever the
ma te rial is changed:

The dry ing hop per and suc tion box must be cleaned

&

The ser vice in ter vals re fer to a 3-shift op er a tion.

F

The given main te nance in ter vals are av er age val ues.

Check whether in your in di vid ual case the main te nance in ter vals must be
short ened.

5

0

6-

2

M

S

STT 110 / STT 160

Main te nance 5-3

Advertising
This manual is related to the following products: