Caution, Notice – PB Heat WV Series User Manual

Page 20

Advertising
background image

18

MAINTENANCE

2. To thoroughly clean the boiler it must be brushed

down from the top. Alternatively, for limited space or
minimum clearance to combustible installations,
cleaning the heat exchanger from the combustion
chamber side is acceptable. If unit is extremely dirty, it
may be necessary to brush from both directions. The
target wall is made of a soft ceramic fiber. Care must
be taken not to damage this material during cleaning.

3. Remove any scale or soot from the combustion

chamber area by vacuum cleaning or any other
available means.

4. Replace oil burner and flue collector cover plate

making sure all gaskets are in place.

5. Replace jacket top panel.

6. Inspect venting system.

G. IF A LONG SHUTDOWN IS REQUIRED

1. To take boiler out of service if the boiler and system

are not to be used when temperatures are below
freezing:

a. Drain the boiler and system completely and shut

off make-up water supply.

b. Open main line power disconnect switch to

boiler. Remove the fuses or secure the switch so
that the power cannot be turned on accidentally.

2. Be certain that the boiler and system are refilled

before returning to service.

Always keep the manual fuel supply
valve shut off if the burner is shut
down for an extended period of time.

CAUTION

All cover plates, enclosures, and
guards must be maintained in place
at all times, except during
maintenance and servicing.

NOTICE

Burner mounting plate must be
opened to facilitate this operation.

NOTICE

Advertising
This manual is related to the following products: