Outdoor unit – Panasonic CU-C12DKU User Manual

Page 40

Advertising
background image

HOW TO TAKE OUT FRONT GRILLE

Please follow the steps below to take out front grille if
necessary such as when servicing.
1. Open the intake grille and remove the screw at the front of

the front grille.

2. Set the vertical airflow direction louver to the horizontal

position.

3. Slide down the 2 caps on the front grille as shown in the

illustration at right, and then remove the 2 mounting screws.

4. Pull the lower section of the front grille towards you to

remove the front grille.

When reinstalling the front grille, first set the vertical
airflow direction louver to the horizontal position and
then carry out above steps 2 - 3 in the reverse order.

AUTO SWITCH OPERATION

The below operations will be performed by pressing the
“AUTO” switch.
1. AUTO OPERATION MODE

The Auto operation will be activated immediately once the
Auto Switch is pressed.

2. TEST RUN OPERATION (FOR PUMP DOWN/SERVICING

PURPOSE)
The Test Run operation will be activated if the Auto Switch
is pressed continuously for more than 5 sec. A “pep” sound
will occur at the fifth sec., in order to identify the starting of
Test Run operation

3. REMOTE CONTROLLER RECEIVING SOUND ON/OFF

The ON/OFF of Remote Controller receiving sound can be
change over by the following steps:
a) Release the Auto Switch after Test Run operation is
activated.
b) Then, within 20 sec. after (a), press Auto Switch for more
than 5 sec..A “beep” “beep” sound will occur at the fifth
sec., then release the Auto Switch.
c) Within 20 sec. after (b), press Auto Switch again.

Everytime Auto Switch is pressed (within 20 sec. interval),
remote controller receiving sound status will be reversed
between ON and OFF.
Long “beep” sound indicates that remote controller
receiving sound is OFF.
Short “beep” sound indicates that remote controller
receiving sound is ON.

10.6. Outdoor unit

10.6.1. SELECT THE BEST LOCATION

(Refer to “Select the best location”
section)

10.6.2. INSTALL THE OUTDOOR UNIT

After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.

1. Fix the unit on concrete or rigid frame firmly and horizontally

by bolt nut. (ø13/32”).

2. When installing at roof, please take into consideration

strong winds and earthquakes. Please fasten the
installation stand firmly with bolt or nails.

40

CS-C9DKU CU-C9DKU / CS-C12DKU CU-C12DKU

Advertising
This manual is related to the following products: