3 c200hx/hg/he controller link units, C200hx/hg/he controller link units – Omron CQM1H-CLK21 User Manual

Page 116

Advertising
background image

93

C200HX/HG/HE Controller Link Units

Section 4-3

Note

1.

Always turn OFF the PLC’s power before setting the terminating resistance
switch.

2.

Turn ON the switch to connect terminating resistance at the nodes at both
ends of the Network and turn OFF the switch at all other nodes. Normal
communication cannot be performed in the Network unless all the nodes
are set properly.

3.

The TER LED indicator will light when the terminating resistance switch is
set to ON.

4.

The default setting is OFF (not connected).

4-3

C200HX/HG/HE Controller Link Units

The following settings are required for a Controller Link Unit used with a
C200HX/HG/HE PLC.

Item

Switch

Page

Node address

Node address switches

94

Baud rate

Baud rate and operating level switch, pins 1
and 2

95

Operating level

Baud rate and operating level switch, pin 4)

95

Terminating resistance

Terminating resistance switch

96

Advertising
This manual is related to the following products: