Installation – mounting the hood – Zephyr ZRM-E36AS User Manual

Page 11

Advertising
background image

9

 $GGDQGVHFXUHZRRGEORFNLQJ minimum 2 x 4 RQWRFHLOLQJMRLVWV

2. Fasten top support frame to desired location on ceiling using 4 2” wood screws with washers. The wider

section of the support bracket faces the front of the hood.

3. Determine height requirement and secure bottom support frame to top support frame by using 8 M4*7

VFUHZV 2 on each angle bracket 

4. Lift hood and align the locking tabs on top of hood with the 3 tab cut-outs on bottom of support frame.

Make sure the 4 threaded posts on top of the hood pass through the holes on bottom support frame.
Slide hood forward to lock into place.

5. Secure hood to bottom support frame by fastening 4 wing-nuts over the 4 threaded corner posts on top of

hood body.

6. Install damper, duct work and electrical. If using hood in recirculating mode you must install the air

diverter plate before assembling the duct covers. Turn to page 11 for instructions.
1RWH+RRGLVLQWHQGHGWREHPRXQWHGWRD¿QLVKHGFHLOLQJ

Front

2

1

3

6

5

4

Ceiling Joists

Wood Blocking

Top Support Frame

Bottom Support Frame

Hood

CAUTION: At least two installers are

required due to the weight and size of the
hood.

!

WARNING: Electrical wiring must be done by a qualified person(s) in

accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.

!

Installation –

Mounting the Hood

Advertising