JBL 29AV User Manual

Eyebolt applications, For installation of control 29av

Advertising
background image

When suspending JBL Control 29AV loudspeakers, you MUST utilize Load-Rated Steel Forged
Shoulder Eyebolts
. The load rating must be stamped on the side of the eyebolt and there must
be a shoulder, as shown in Fig 1. The correct threading for the Control 29AV is M6. This means
that the threaded shaft has a diameter of 6mm. The threaded shaft length will vary according to
which insert point is being utilized.

Top & Bottom Inserts -- When using the installation points at the top and bottom of the
cabinet, where the flat surfaces are, the eyebolt threads directly into the insert. Be sure to tighten
the bolt all the way down so that the shoulder is snug against the surface of the cabinet. To do
this, you must ensure the correct length of bolt so that the threads do not “bottom out” (stop
turning) before the shoulder reaches the cabinet surface. For the top or bottom inserts, the shaft
should be 12mm (1/2 inch). See Figure 2:

Eyebolt Applications

For Installation of

Control 29AV

For top or bottom inserts, use 6
mm x 1mm pitch x 12 mm thread
length steel forged shoulder
eyebolts

Advertising