Setting up the hardware – Samsung CLX-9250ND User Manual

Page 6

Advertising
background image

Setting up the hardware_ 5

1.

Setting up the hardware

We recommend you leave to setting up the hardware to the installation engineer from Samsung or
the dealership where you bought the machine.
This chapter gives you step-by-step instructions for setting up the hardware. We recommend you
set up the hardware following the order in this chapter.

This chapter includes:

Installation environment

Machine configuration

Optional goods by models

Installation flow of the hardware

Unpacking and placing the hardware

Installing the cabinet stand, optional dual cassette feeder or optional high capacity feeder

Installing the duplex automatic document feeder

Installing the accessory box

Removing the scanner locking screw

Putting the rubber packings

Installing the right tray (face up)

Installing the toner cartridges

Installing the imaging units

Installing other options

Loading paper

Connecting a printer cable

Turning the machine on

Be sure to go through the following before setting up the hardware:

If you are installing the machine after moving it from a cold to warm location, leave the machine unpacked for at
least two hours so that the machine is fully adapted to the site temperature, avoiding image faults caused by
condensation (The term “condensation” refers to the formation of droplets of water on the surface of a metal
object brought from cold to warm place, i.e., as the result of the rapid cooling of the moisture (vapor) around the
object).

Installation engineer must prepare the screw drivers and diagonal-cutting pliers.

Advertising
This manual is related to the following products: