Commissioning, measuring, calibration

4110

4

ba76137e01

03/2013

Shaft dimensions, material, electrical connection

Connection cable

Accuracy of the IDS measuring technique

Commissioning, measuring, calibration

Commissioning

Prepare the electrode for measuring as follows:

 Remove the watering cap from the electrode tip. Possible salt deposits in

the area of the watering cap do not affect the measuring characteristics
and can easily be removed with deionized water.

Note
Please keep the watering cap. It is required for the electrode to be stored.
Always keep the watering cap clean.

 Remove any gas bubbles behind the pH membrane by shaking.
 Connect the electrode to the meter.
 Calibrate the electrode according to the operating manual of the meter

and observe the following rules while doing so:

Calibration

and measurement:

General rules

 Avoid the carryover of any solution (sample or buffer solution) from one

measurement to the next by taking the following measures:

– Shortly rinse the calibration and sample beakers with the solution the

beakers are to be filled with next.

Model

Shaft

Electrical connection

Length
[mm]

Ø

[mm]

Material

Combination
electrode
connection

Meter
connection

Cable
length

4110

120

12

PPE/PS

Fixed cable

Digital plug

1.5 m

4110-3

120

12

PPE/PS

Fixed cable

Digital plug

3 m

Diameter

4.3 mm

Smallest allowed
bend radius

Fixed installation:

20 mm

Flexible use:

60 mm

Plug type

Socket, 4 pins

Measured parameter

Accuracy (± 1 digit)

pH

± 0.004

U [mV]

± 0.2

T [°C]

± 0.1