DUCT PROOFING AND CABLE INSTALLATION

www.carlonsales.com

Duct Proofing for Cable Pulling

Use 175 or 250 CFM Compressor for maximum line blowing potential. Choose
pull line based on length of pull and tension expected.

1. Remove all plugs in terminator at exit end and only the plug being shot

into on the entrance end.

2. Turn threaded nozzle into terminator until tight, without pull line or missiles

to blow any debris or water which might have collected.

3. Open gate on nozzle to apply air to innerduct. Close gate after any debris

or water has been blown out.

4. Unscrew nozzle and thread pull line through eyelet in nozzle and tie to line

blowing missile. Place pull line reel on stand for feeding.

5. Place line blowing missile into open innerduct and carefully open gate on

nozzle.

6. Feed pull line off reel and keep slight tension to avoid rope packing in

innerduct.

7. When using flat tape as pull line, use twisted blow line (RP142) to blow in

and retrieve flat tape.

Proofing for Jetting Cable

Use 375 CFM compressor for best results

1. Attach polyethylene feed tube (1'' SDR 13.5 for 4 way and 1 3/4'' SDR

13.5 for 3 way) with coupling recommended for high speed air blowing
systems to empty innerduct extension on jet through terminator.

2. Assemble coupling according to high speed blowing system

manufacturers recommended instructions.

3. Attach opposite end of polyethylene feed to high speed air speed

machine.

4. Plug all unused holes in the Multi-Gard terminator at entry point and

remove all plugs at exit terminator. Apply 100 -110 PSI to the Multi-Gard
innerduct. Close the air output valve and stop compressor. The innerduct
is acceptable if a loss of 20 PSI or less happens within 2 minutes of
pressurization. WARNING: NO PERSONNEL IN MANHOLES DURING
PRESSURE TEST.