Motor & coupling installation, Maintenance – Alamo MACHETE FC-0002 User Manual

Page 165

Advertising
background image

MAINTENANCE

MACHETE BOOM 3/09

Maintenance Section 4-19

©2009 Alamo Group Inc.

MAINTENANCE

MOTOR & COUPLING INSTALLATION

Bolt motor to mount plate. Fully tighten bolt (Item 1).

Install flex coupler to the quick disconnect pulley

hub using the countersunk socket head bolts (Item

2). Apply thread locking compound to the bolts.

Tighten bolts to 45 FT-LB. Attach motor mount

angle brackets, (Item 3) to the channel frame, leave

bolts loose.

Insert motor shaft into flex coupling and allow motor

to "find its center."

Adjust motor up as needed to provide ample

clearance between the top of flex coupling and the

motor. Bring angle brackets up to motor mount plate

and tighten the bolts.

Advertising
This manual is related to the following products: