KING 7430 Series PVC_PVDF User Manual

7430 series, Installation instructions

Advertising
background image

(714) 891-0008 • www.kinginstrumentco.com

When it comes to flow...we’re instrumental.

1

7430 Series

PVC/PVDF

Installation Instructions

Flow Meter liMiteD warranty

Meters are warranted against defects in materials and workmanship to the original user for a period of thir-
teen (13) months from the date of factory shipment, provided the meter is installed, operated and maintained
in accordance with King Instrument Company’s instructions and recommendations.
This warranty does not apply if failure is caused or contributed to by any of the following: improper handling,
improper storage, abuse, unsuitable application of the product, lack of reasonable and necessary mainte-
nance, use exceeding suggested pressure and temperature maximums, improper packaging for return, or
repairs made or attempted to be made by anyone other than King Instrument Company, Inc.
KING INSTRUMENT COMPANY, INC. MAKES NO WARRANTY AS TO THE FITNESS OF ITS PRODUCTS FOR SPECIFIC
APPLICATIONS.
This warranty is valid for the original end-user only and does not apply to products that have been damaged
or modified. This warranty is non-transferrable and is limited to replacement or repair. The liability of King In-
strument Company arising out of its supply of the products, or their use, shall not in any case exceed the cost
of correcting defects in the products as set forth above.
THIS WARRANTY IS A LIMITED WARRANTY AND SHALL BE IN LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR
IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR A
PARTICULAR PURPOSE. THERE ARE NO OTHER WARRANTIES WHICH EXIST BEYOND THE DESCRIPTION OR FACE
HEREOF.
IN NO EVENT SHALL KING INSTRUMENT COMPANY BE LIABLE FOR LOSS OF PROFITS, INDIRECT, CONSEQUEN-
TIAL OR INCIDENTAL DAMAGES.
Products should be returned, prepaid, to King Instrument Company, Inc. with proof of purchase. Call factory
for Return Merchandise Authorization (RMA) number and return instructions.

this is iMPortant inForMation.
reaD it CareFully beFore beginning work.

1) Inspect meter for damage that may have occurred during shipping.
Report any damage to the container to the freight carrier immediately.
2) Make sure your pressure, temperature, fluid and other requirements
are compatible with the meter (including o-rings.)
3) Select a suitable location for installation to prevent excess stress on
the meter which may result from:

a) Misaligned pipe.

b) The weight of related plumbing.

c) “Water Hammer” which is most likely to occur when flow is

suddenly stopped as with quick closing solenoid operated

valves. (If necessary, a surge chamber should be installed. This

will also be useful in pressure start-up situations.)

d) Thermal expansion of liquid in a stagnated or valve isolated

system.

e) It is recommended to install valving which will allow the meter

to be drained. Meter should be drained when not in use or

prior to maintenance.

f) Instantaneous pressurization which will stress the meter and

could result in tube failure.

note:

In closed thermal transfer or cooling systems, install the meter

in the cool side of the line to minimize meter expansion and
contraction and possible fluid leaks at the threaded connections.

4) Handle the meter carefully during installation.

a) Use an appropriate amount of teflon tape on external pipe

threads before making connections. Do not use paste or stick

type thread sealing products.

b) Over tightening of plastic connections may result in fitting

damage.
5) Install the meter vertically with the inlet port at the bottom.
6) Meters with plastic fittings must be installed so that fittings are not
made to support any part of the associated plumbing. In addition,
meter frame should be fastened to bulkhead, panel or column.
7) Meters used in gas service should have suitable valves plumbed in
at the inlet and outlet of the meter. These valves should be no more
than 1-1/2 pipe diameters from the meter ports. The valve at the out-
let should be used to create back pressure as required to prevent float
bounce. It should be set initially and then left alone. The inlet valve
should be used for throttling purposes. Depending on the installation,
valves may not be essential, but they are most useful in many instal-
lations. Remember: To get a correct reading of flow in gas service, it is
necessary to know the pressure right at the outlet of the meter (before
the valve).
8) Pressure and temperature maximums must never be exceeded.

PVC/PVDF

Advertising