Importing cal or ver kits, Deleting cal and ver kit information, Commands and routines – Luminex xPONENT 4.2 for FLEXMAP User Manual

Page 111: Tab. see, Importing, Cal or ver kits

Advertising
background image

Verifier - If a verification reagent is selected, the Lot Details table displays target

information.

Sheath Fluid - Click Edit, enter the Current Lot# and Expiration date.

Import Kit - Opens the Import Calibration or Performance Kit dialog box to import a kit.

Import - Opens the Import Calibrator or Verification Lot dialog box to import a lot.

Export - Opens the Export Calibrator or Verification Lot dialog box. Select a name and

location to save the calibrator or verification lot and click Save.

Add New - Adds a new lot. Add information in the Lot Details section on the right side of

the window. Type a Lot #, Expiration, and target in the appropriate boxes and fields. Click
Save to save the lot, or select. Cancel to cancel the entry.

Delete - Deletes a lot selected in the Active Reagents list.

Importing CAL or VER Kits

Follow these steps to import a CAL or VER kit.

1. Open the Maintenance page, then open the Lot Management tab.

2. Click Import Kit. The Import Calibration or Performance Kit dialog box opens.

3. Select the kit you want to import, then click Open.

Deleting CAL and VER Kit Information

1. Open the Maintenance page, then open the Lot Management tab.

2. In the Active Reagents section, select the kit you want to delete from the Calibration

Kit or Performance Verification Kit lists.

3. Click Delete Kit.

CAUTION:

There is no confirmation dialog box when you delete a kit.

Commands and Routines

Routine Name - This list of pre-set routines and commands can be used for system
maintenance. Some of these commands are also available on the Auto Maint. tab.
Additionally, you can create custom routines on this tab, which display in the Routine Name
list once you save the routine. To create a custom routine, start with None and add the
desired commands. You can also modify a Luminex routine and save it as a new routine.
Select from the following routines:

<None>

Calibration Verification (Luminex)

Daily Instrument Shutdown (luminex)

Daily Instrument Startup (Luminex)

Fluidics Maintenance (Luminex)

Prepare for Storage (Luminex)

Maintenance Page

97

Advertising