Bridge Beam

End Truck

Crane Runway

Figure 3-6

3.2.3

Refer to Figure 3-7 and check the following.

a) Bridge beam centered on each end truck.

b) Squareness of end truck frames to bridge beam; (X = Y).

X

Y

D

Right Angle

MEASURE DIAGONAL DISTANCES BETWEEN

END TRUCK FRAMES. "X" MUST EQUAL "Y"

Figure 3-7

Make adjustments as necessary. Then securely tighten each fastened connection of the end
truck frame to bridge beam. Refer to tightening torque values of Table 3-1.

3.2.4

Move the crane along the full length of the runway. Check for binding and guide roller clearance
(normal clearance is 5 mm from each guide roller to runway rail edge).

3.2.5

Install braces on the crane bridge and the end trucks. Refer to Figure 3-8. Note: Figure 3-8
depicts a crane with two braces per end truck. Manual or Push crane systems require only one
brace per end truck.