Step 2: install the network management card – American Power Conversion AP9619 User Manual

Page 11

Advertising
background image

Installation and Quick Start

7

Installation in a UPS

Step 2: Install
the Network
Management
Card

If you are installing the Management Card in a Symmetra UPS
that uses more than one

APC

management product, see

Installation of Multiple Management Cards, a copy of which
came with the Management Card. You must install the APC
management products in the correct order for them to operate
properly.

1. Use the same screws that hold the slot cover in place to

secure the Management Card in the

UPS

card slot.

2. Connect a network interface cable to the 10/100Base-T

network connector on the Management Card.

3. Reconnect the

UPS

to its input power source.

4. Turn on the

UPS

.

5. See “Quick Configuration” on page 10.

Caution

The Network Management Card is sensitive to
static electricity. When handling the
Management Card, touch only the end plate
while using one or more of these electrostatic-
discharge devices (ESDs): wrist straps, heel
straps, toe straps, or conductive shoes.

Advertising
This manual is related to the following products: