Hired-Hand Baffles, Vents, & Inlets: GRAVITY VENT DOOR Installation User Manual

Gravity vent door, Installation

Advertising
background image

Hired-Hand Manufacturing, Inc.

• 1733 County Road 68 • Bremen, Alabama 35033 • PH 256-287-1000 • FAX 256-287-2000

Manual Part No. 4801-5371 Rev 6-07

Page 1 of 2

Parts List

Tools

Required

Part Number

Description

Quantity

Drill

6409-2200

/Vent Door GVD CAB ASSY

1

Saws

6409-2202

/Vent Door GVD WEIGHT ASSY

1

1004-0050

SCRW SM #14x1 HX W SL Tek Z

8

1004-7120

SCRW Lag 1/4x1-1/4 Zinc

8


















Directions

1. Mark rough opening for vent door on wall. The

vent should be a minimum of 8.5" (21.6 cm)
from the ceiling. See Figure 2.

2. Cut rough opening to size as shown in Table A

above.

3. Install vent. Insure that vent is mounted squarely in opening

and oriented for the proper air flow direction. Screws are
provided for either mounting in wood framing (1004-7120) or
metal (1004-0050).

4. Install Weight Assembly.

5. Adjust Weight to desired setting.

6. See the Vent Performance Chart on page 2.

Part Number

Vent Size

Rough Opening

6609-2200

12.75” x 45.625 (32.38 cm x 115.89 cm)

13.5” x 46.5” (34.29 cm x 118.11 cm)

GRAVITY VENT DOOR

Installation

Table A

Air Flow

8.5" minimum
from

ceiling

Figure 2 – Vent Mounting

Figure 3 – Gravity Vent Door Front & Side View

Weight
Assembly

Cabinet

Assembly

Figure 1

Gravity Vent Door

Advertising