Hired-Hand Funnel Flow Fans: Metal Pit Transition Fan Combo Installation (24 Funnel Flow Fan) User Manual

Metal pit transition fan combo installation, Warning, Funnel flow fan

Advertising
background image

HIRED-HAND MFG., INC. • 1733 County Road 68 • Bremen, Alabama 35033 · Phone 256-287-1000 • Fax 256-287-2000

Manual Part No. 4802-5251 Rev 7-07

Page 1 of 6






Warning!

Disconnect all Electrical Power before installing the Pit Transition Fan!





TOOLS REQUIRED

PART NUMBERS







DESCRIPTION

The Pit Transition Combo Unit is used to mount a 24" fan and transition unit to control the air flow from an opening to provide
horizontal exhaust. It is mounted directly to the wall opening. Figure 1 shows the overall dimensions of the Pit Transition
Combo (PTC). The PTC is available in 304 Stainless Steel (6612-0112) or 409 Stainless Steel (6612-0109).
























Flat Head Screwdriver

3/8 Bit Driver

Electric Drill

7/16 Wrench

3/8”Nut Driver

7/16 Bit Driver

Part Number

Description

6612-0112

TU-24 304 SS Transition Unit Combo

6612-0109

TU-24 409 SS Transition Unit Combo

IMPORTANT!

Locate packing slip and make sure that all listed parts are enclosed. If not, call your Hired-Hand distributor
immediately. Please read and understand all instructions in this manual before installing the Pit Transition Fan.

Metal Pit Transition Fan Combo Installation

24

"

Funnel Flow Fan

!

!

Figure 1 - Pit Transition Unit Combo

69"

36"

28"

1 1/2"

15"

24"

39"

30"

30"

15 1/2"

24"

2 1/2"

8 1/2"

1 1/2"

28"

Front View

Side View

4"

1 1/2"

31"

Fan Mounting
Flange

Advertising