Rhino Shelter DOMED-40W X 60L X 18H User Manual

Safety warning

Advertising
background image

requires a high level of care and safety. BigBear buildings

new Big Bear buildings portable enclosure is a combination

Congratulations on your purchase of a Big Bear buildings

Assembly Instructions 40x60x18 Domed Style Truss Building

1

Version 3.1

Please DO NOT return unit to store or dealer. For all questions or shortages please contact

Customer Service at: 800-447-7079 or 203-877-7070

ASSEMBLY INSTRUCTIONS

DOMED STYLE 40x60x18


CONGRATULATIONS!

40x60x18 Round Style Portable Building. With proper
installation, use and maintenance, your new unit will
provide many years of good and suitable service. Your

of excellent engineering and well thought out design.
The unit is comprised of a rigid tubular frame, covered
with a long life polyethylene cover and door ends.

The multiple part frame assembly is pre-drilled for easy
insertion of frame bolts. The tubing is made from high--
grade galvanized steel, resisting moisture and oxidation
over the life of the shelter. The cover and doors are
made from ASTM-5 approved polyethylene materials.
The cover is UV protected for exposure to sunlight.

SAFETY WARNING

The installation of this unit must conform to the

requirements of all authorities having jurisdiction in

your specific local area. In the absence of such

requirements, the assembly and installation must

conform to the provided assembly and installation

instructions. MDM Products, LLC will not
responsible for failure to comply with any

requirements in a given local area. Damages,

consequential damages, or injuries caused by

improper installation, alteration, improper use, or

damages caused by snow, wind, or any acts of

nature are strictly that of the user. Unit is not

intended for occupancy for any length of time. NO

running of internal combustion engines, open

flames or contact with heated surfaces is allowed.

For installation assistance or Customer Service, please
call 800-447-7079 or 203-877-7070, 8AM-5PM EST.
Cartons should be inspected upon delivery from carrier,
and any evident damages should be noted on the bill of
lading before signing. If upon opening the cartons hidden
damage is discovered, contact carrier or it’s agent
immediately. Claims for shipping damage MUST be
made with the shipping company. An inspection of the
goods will most likely be required. Do not discard
packing or any components before the freight company
inspection. All claims for freight damage must be made

within 15 days of receipt of the

goods in accordance with

ICC regulations.

The proper erection and installation of this building

strongly recommends that all OSHA safety regulations
be complied with. This includes but is not limited to:

x

Safety Hats, Protective Eyewear and Protective
Clothing

x

Safety Harnesses for all Elevated Workers

x

Proper Ladder, Cage, and Safety Equipment

Due to the size of some building components, some
power equipment may be required or used. Operators
must be trained and fully capable of safe operation.

ASSEMBLY PROCEDURE

The proper sequence and steps to install this unit will
produce a proper and good installation. Failure to read
and follow these guidelines may result in an improper
installation and will void all warranty and protection the
owner is entitled to with the product. The overall steps to
be undertaken are:

1. Perform an inventory check before beginning, to

be certain all components are available for
installation.

2. Prepare location and place all unit boxes near

location sight.

3. Assemble Seven (7) Arch Assemblies of unit.
4. Secure Base Plates to Base Surface.
5. Begin Frame Assembly with Front End Arch, first

Interior Arch, and Wind Braces with the first
ridge crest, and side rail sections.

6. Add additional Interior Arch Assemblies with

each section of side rails.

7. Add Rear Arch and Rear Wind Braces. Plumb

Frame of Unit.

8. Install Rear Panel and Front Panel Framing.
9. Install Main Cover over frame assembly.
10. Install Front Fabric Panels over Front Panel.
11. Install Rear Fabric Cover over Back Panel.
12. Install Front Mechanical Roll Up Door.
13. Install Rear Mechanical Roll Up Door.


Advertising