Rhino Shelter SM ROLL-UP DOOR KIT User Manual

Roll up door kit

Advertising
background image

Roll Up Door Kit

Instruction Manual

www.mdmshelters.com

PREPARE AND INSTALL DOOR BASE POCKET TUBING

There are two pipes provided for each Roll Up Door. Insert swedged end of one

into the female end of the second pipe. Secure with self-tapping screw provided.

Fill pipe with sand and secure with a Black plastic insert on each end. Insert

weighted tubing assembly into Pocket along Bottom edge of Roll Up Door.

ATTACHING PULLEYS TO MAIN COVER

The two (2) pulleys should be installed on the outside edge of the Main Cover,

with the clips of the pulley hung over the welded-in rope. The Pulleys should be

attached 6-12” inside the zippers evenly along welded-in rope. Measure into the

center of the unit from each zipper to locate pulleys properly. Using a razor knife,

cut a vertical ½” slot over the rope channel.

STOP YOUR DOOR IN ANY POSITION

EASY ENTRY AND CLOSING OF FABRIC DOORS

ALL PARTS ARE WEATHER RESISTANT

ROLL UP DOOR KIT WORKS ON EITHER END OF SHELTER

Roll Up Door Kit includes:

2 Pulleys

1 Roll of Rope

2 Black Plugs

1 Cleat

2 Screws

2 Telescoping Tubing for Door Pocket

READ DIRECTION COMPLETELY BEFORE BEGINNING

Main Cover

End Arch Tubing Member

Welded Rope on Main Cover

Pulley Assembly for

Outside Door Roll Up

Pull Down to Open Door

Door Fabric

Weighted

Tubing in

Door Base

Pocket

Advertising
This manual is related to the following products:
Table of contents