HT instruments SOLAR300N User Manual

Page 29

Advertising
background image

SOLAR300 - SOLAR300N

EN - 27

12/09/2006 – 16:55:10

WATTMETER12 – Page x/y

V12

I1

Patt12

Preatt12

Papp12

Pf12

CosPhi12

=

=

=

=

=

=

=

0.0 V

0.0 A

0 W

0 Var

0 VA

0.00i

0.00i

PAGE

SCOPE

HARM

VECTORS

PARAMETERS CAPTION:
V12

 Phase L1 – Phase L2 voltage

I1

 Current on L1 phase

Pact12

 Active Power Wattmeter 12

Preact12

 Reactive Power VARmeter 12

Papp12

 Apparent Power VAmeter 12

Pf12

 Power Factor Wattmeter 12

CosPhi12

 Power Factor between fundamental of

 voltage and current Wattmeter 12

Fig. 45: Page of numerical values Wattmeter-Varmeter 1-2

12/09/2006 – 16:55:10

WATTMETER32 – Page 4/5

V32

I3

Patt32

Preatt32

Papp32

Pf32

CosPhi32

=

=

=

=

=

=

=

0.0

V

0.0

A

0 W

0

Var

0 VA

0.00i

0.00i

PAGE

SCOPE

HARM

VECTORS

PARAMETERS CAPTION:
V32

 Phase L3 – Phase L2 voltage

I3

 Current on L3 phase

Pact32

 Active Power Wattmeter 32

Preact32

 Reactive Power VARmeter 32

Papp32

 Apparent Power VAmeter 32

Pf32

 Power Factor Wattmeter 32

CosPhi32

 Power Factor between fundamental of

 voltage and current Wattmeter 32

Fig. 46: Page of numerical values Wattmeter-Varmeter 3-2

12/09/2006 – 16:55:10

FLICKER – Page 5/5

V12

V23

V31

Pst1’

0.0

0.0

0.0

Pst

0.0

0.0

0.0

Pst max

0.0

0.0

0.0

Plt

0.0

0.0

0.0

Plt max

0.0

0.0

0.0

Recording Time: 00h – 00min

PAGE

SCOPE

HARM

VECTORS

PARAMETERS CAPTION:
Pst1’

 Short term severity after 1 minute

Pst

 Short term severity

Pstmax

 Maximum short term severity

Plt

 Long term severity

Pltmax

 Maximum long term severity

Recording Time

 real time duration of recording

expressed in HH:MM

Fig. 47: Page of Flicker values

25/01/2013 – 16:55:10

TOT. ENERGY CONSUMPTION – Page x/y

Eact =

0

kWh

Ppeak =

0

kW

Date Ppeak

:

-- / -- / -- 00:00:00

Start rec.

:

-- / -- / -- 00:00:00

Stop rec.

:

-- / -- / -- 00:00:00

Rec. Time

:

- - -

Int. Per.

:

- - -

Rec: - -

PAGE

SCOPE

HARM

VECTORS

PARAMETERS CAPTION:
Eact

 Total active energy consumed when starting

recording.
Ppeak

 Maximum peak of consumed active power.

Date Ppeak

 Date and time in which the peak occurred.

Start rec.

 Date when recording was started.

Stop rec.

 Date when recording was stopped.

Rec. Time

 Time elapsed from Rec Start.

Int. Per.

 Value of the set integration period.

Rec

 Number of the recording in progress

Fig. 48: Consumed energy page




Advertising
This manual is related to the following products: