2

Installing Gauge Guard

3

Installing Pulsation Dampener

4

Installing Pump

1

Location

Ÿ

Before installing gauge guard, PTFE (or
similar) thread tape should be used on the
male NPT to assure a seal.

Ÿ

DO NOT over tighten or use pipe wrenches
on plastic pipe components

Optional Item

Ÿ

Remove all pressure from skid system
prior to dampener installation.

Ÿ

Install dampener before charging or
pressurizing.

Ÿ

DO NOT start system without first
charging or pressuring dampener.

Ÿ

Always wear safety glasses and other
appropriate safety equipment when
installing, charging or repairing
dampener.

Ÿ

Mount pump to skid using
enclosed hardware.

Ÿ

Choose an area located near chemical
supply tank, chemical injection point,
and electrical supply

Ÿ

Mount Pump to the skid using enclosed
mounting hardware

Brackets

SS (Qty: 4)

Washer, SS (Qty: 8)

Hex Nut, SS (Qty: 4)

Socket Head

Screw, SS

#10-32 - .5”

(Qty: 4 per pump)

80000-470 Rev. 12/20/2011