Three stage installation 9, Three stage installation – ATEN CS-9134 User Manual

Page 13

Advertising
background image

Three Stage Installation

The procedures for setting up a three stage installation are essentially the same
as for a two stage installation. With a three stage setup, as many as 64 (CS-9134)
or 512 (CS-9138) computers can be controlled in a complete installation.

A table showing the relation between the number of computers and the number of
Master View units needed to control them is provided in the Appendix.

Note: Master View units cannot be cascaded beyond the third level.

To set up a three stage installation, do the following:

1. Make sure that power to all the devices you will be connecting up, including

all preexisting devices on the installation, have been turned off.

2. Use a KVM cable set (described in the Cables section, p. 3), to connect

any available CPU Port on the Second Stage unit to the Console Port
connectors of the Third Stage unit.

3. Use KVM cable sets (described in the Cables section, p. 3), to connect any

available CPU port on the Third Stage unit to the Keyboard, Video, and
Mouse ports of the computers you are installing, as shown in the diagram
on page 10.

2005-12-21

CS-9134 / CS-9138 User Manual

9

Advertising