HP XP P9000 Command View Advanced Edition Software Licenses User Manual

Page 86

Advertising
background image

Related topics

About virtualizing storage tiers

, page 77

Applying a data placement profile for Smart volumes

Before beginning application processing, apply a data placement profile to restore a data placement
that fits the characteristics of the processing. After confirming that the data placement is restored and
performance is improved, release the applied profile to return to normal Smart operation.

TIP:

To apply or release the profile periodically to match the application operations, click
Schedule Profiles to schedule when to apply and release the profile. When you apply the profile,
you can also specify a release schedule.

The capacity ratio of Tier 1 might exceed the value specified for the maximum allocation threshold
if a data placement profile and a tiering policy are being used concurrently.

Prerequisites

A Tiered Storage Manager license must be registered

A data placement profile must be created

Gather the name of the target logical group

Specify settings for checking performance information, such as settings for linking to HP Storage-
Works P9000 Performance Advisor software, or settings for the performance monitoring software
of each application

TIP:

If linked to HP StorageWorks P9000 Performance Advisor software, you can view performance trend
charts for the volumes in the logical group from the Manage Data Placement Profiles dialog box.
For details on the linking method, see the

HP P9000 Command View Advanced Edition Suite Software

Administrator Guide.

1.

On the Mobility tab, General Tasks pane, select Manage Data Placement Profiles.

2.

Click the Overall Profile View button, or Logical Group View button, to view the creation date,
usage, and effect of applying profiles in the past, and select the row of the profile to be applied
(only one profile can be selected) from the list of data placement profiles, and then click the Apply
Profile button.

3.

To create a plan, specify the necessary items by following the instructions in the window.

4.

If there is no problem with the plan, execute it.

5.

View the list of tasks to see the execution results.

After the monitoring and data relocation of Smart pools finish, perform the following operations
to check the effect of applying the profile, and to release the applied profile.

Managing storage resources in a SAN environment

86

Advertising