Hardware options installation 61

12.

Route and connect the drive cage bay 2 power cable (BP2) and the SAS cables to the drive cage

backplane.

13.

Install the fan cage.

14.

Install the air baffle.

15.

If removed, install the BBWC battery pack or the FBWC capacitor pack ("

Installing the BBWC battery

pack or the FBWC capacitor pack

" on page

86

).

16.

Install fan 5.

17.

Install the access panel.

18.

Do one of the following:

o

Close or install the tower bezel, as needed.

o

Slide the server back into the rack.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server unless

all bays are populated with either a component or a blank.

19.

Install the hard drives and hard drive blanks.

20.

Power up the server (on page

22

, "

Powering up and configuring the server

" on page

40

).

Installing the eight-bay SFF drive cage (bay 3)

To configure this option for drive cage bay 3, locate the three jumper pins on the backplane. Move the

jumper from pins 1 and 2 to pins 2 and 3.
For more information, see "Drive cage jumper configuration settings (on page

21

)."

1.

Power down the server (on page

22

).

2.

Do one of the following:

o

Open or remove the tower bezel, as needed ("

Open or remove the tower bezel

" on page

22

).

o

Extend the server from the rack (on page

24

).

3.

Remove the access panel (on page

25

).

4.

Remove fan 5 (on page

26

).

Advertising