Ifr output tests 11-8, Output tests 11-8, To-from flag tests 11-8 – Apollo 65 User Manual

Page 288: Ifr output tests -8

Advertising
background image

4. After entering the Seed Position, you will be

prompted next to clear the active flight plan.
Choose Yes or No with the

SMALL

knob. Press

ENTER

to continue normal operations.

Clear Active

Flight Plan

NO?

IFR Output

Tests

A series of tests covering connections for IFR flight are
tested if your Apollo GX has been installed and
configured for IFR flight.

Starting IFR

Output Tests

After the completion of all tests the Apollo GX will
start normal navigation operation.

CDI Output Tests
The CDI (Course Deviation Indicator) outputs are
tested first. Each of the following displays is shown for
two seconds, during which the external CDI needle
should be driven as indicated by the display, which is
up to the user to verify.

CDI Tests

CDI Full Right

CDI tests and display screens are provided for CDI
Full Right, CDI Half Right, CDI Centered, CDI Full
Left, and CDI Half Left.

TO/FROM Flag Output Tests
The To/From Flag outputs are tested next. Each of
the following displays is shown for three seconds,
during which the external To/From flag should be
driven as indicated by the display, which is up to the
user to verify.

11-8

Start Up Displays

ENTER

Advertising
This manual is related to the following products:

60, 55, 50