Warning, Maintenance – Admiral ADM8IE - 10080030 User Manual

Page 18

Advertising
background image

MAINTENANCE

ADMIRAL 86038270 05/22/07

17

!

WARNING:

SOLUTION PUMP REPLACEMENT

1. Turn off all switches and unplug the machine.

2. Remove recovery tank.

3. Remove the (2) screws that fasten the solution tank to the frame, and tilt tank back to expose the inside of the

frame.

4. Remove solution hoses from fittings in pump.

5. Remove the (2) screws that fasten the pump to the frame.

6.

Reverse process to install pump.

ONLY QUALIFIED MAINTENANCE PERSONNEL ARE TO PERFORM THE FOLLOWING REPAIRS.

BELT REPLACEMENT

1. Turn off all switches and unplug machine.

2. Remove recovery tank and brush.

3. Remove the (2) screws that fasten the solution tank

to the frame, and tilt tank back to expose the inside
of the frame.

4. Loosen the (4) screws that hold the brush motor in

place and slide motor forward to release tension in
belt.

5.

Remove the (2) screws that fasten the vacuum shoe
links (p/n 86227350 – PRV NO. 05016) to the brush
housing.

6. Remove the (3) screws that fasten

the side plate (p/n 86249420 – PRV
NO. 62759) to the brush housing to
remove belt.

NOTE: All components associated with
driving the brush will come out with the
side plate.

7.

Reverse process to install belt.

86249420
PRV NO. 62759

86227350
PRV NO. 05016

Pressure Switch

86161980

PRV NO. 42-809332

Valve Asm

86258830

PRV NO. 84161

Diaphragm

86003400

PRV NO. 29206

Pump Replacement Parts for Shurflo 100 psi (86026400 – PRV NO. 65254)

PumpHead

86251040

PRV NO. 65187

Motor

86247370 - PRV NO. 53246

Diaphragm

86235120

PRV NO. 29219

Pump Head

86251090

PRV NO. 65204

Valve Asm

86258860

PRV NO. 84166

Pump Replacement Parts for Flojet 100 PSI 230V (86004770 – PRV NO. 47477)

Advertising
This manual is related to the following products: