Nor-Lake ICE CRUSHER N14CRSS-A User Manual

Inspection, Installation

Advertising
background image


ICE CRUSHER

N14CRSS-A

Installation, Operation and

Maintenance Instructions



INSPECTION

When the equipment is received, all items should be carefully checked against the bill of lading to
insure all crates and cartons have been received. All units should be inspected for concealed
damage by uncrating the units immediately. If any damage is found, it should be reported to the
carrier at once, and a claim should be filed with the carrier. This equipment has been inspected and
tested in the Nor-Lake Manufacturing Facility and has been crated in accordance with
transportation rules and guidelines. Manufacturer is not responsible for freight loss or damage.


INSTALLATION

GENERAL

After the unit crate and crate base have been removed, locate the legs for installation. Attach the
legs to the ice crusher base by screwing them into the same threaded fittings that were used to
secure the crate base to the cabinet. Insure that the legs are screwed completely into the base.

Exterior Dimensions

W x D x H

15-1/2" x 20" x 44"

39.4cm x 50.8cm x 111.8cm


ELECTRICAL

Check the proposed outlet to be used to insure that the voltage, phase, and current carrying
capacity of the circuit from the electrical panel correspond to the requirements of the unit. NEVER
use an extension cord. All wiring between the electrical panel and the unit must be done in
accordance with the National Electric Code and all state and local codes. Refer to serial tag for all
pertinent electrical information.

A reset button is located on the front of the cabinet should the motor kick-off during operation.


Type of

Connection

Voltage/Hz/Ph

Cord NEMA 5-15P

115/60/1

© Nor-Lake 2004 6/04 035397

Advertising