AZEK Bullnose Paver & Transition Paver User Manual

Bullnose paver & transition paver install guide

Advertising
background image

Bullnose Paver &

Transition Paver Install Guide

TRIM

MOULDING

DECK

PORCH

RAIL

PAVERS

Installing AZEK Resurfacing Bullnose Pavers .................................................................2

Installing AZEK Resurfacing Transition Pavers ...............................................................3

Patterns ...................................................................................................................................4

Notes ........................................................................................................................................7

Installation Guidelines

AZEK Pavers should be installed in accordance with the local building codes and the installation guidelines.
AZEK Building Products, Inc. accepts no liability or responsibility for the improper installation of this product.
AZEK Pavers may not be suitable for every application and it is the sole responsibility of the installer to be
sure that AZEK Pavers are a fit for the intended use. Since all installations are unique, it is also the installer’s
responsibility to determine specific requirements for each flat roof application. AZEK Building Products
recommends that all applications be reviewed by a licensed architect, engineer or local building
official prior to installation.

STOP! Read this section before you start!

• Do not install where standing, above-ground

water conditions are anticipated. Proper
sub base grading and other storm-water
management designs should prevent the
appearance of water at grade-level. In areas
where small pooling occurs, adhesive can be
used to affix the pavers to the grids to increase
installation integrity.

• Do not install where high volume vehicle traffic

is expected (e.g. crosswalk). AZEK Pavers are
designed for low volume, low speed vehicle
traffic (e.g. driveways, parking lots).

For most current care and cleaning, technical information and more, visit www.azek.com.

• Do not install for use as a fire pit. Grills and fire

bowls may be used when placed over a fire mat
to prevent any damage from burning embers.

• Failure to install AZEK Pavers in accordance

with applicable building codes and this
Installation Guide may lead to personal injury,
affect product performance and void the
product warranty.

Please call AZEK Customer Service at
1-877-ASK-AZEK or visit our Support Center at
www.AZEK.com

Advertising