Air power pack maintenance – Hawk Industries Spinner Manual 550 PNEUMATIC Serial Numbers 106 to 210 User Manual

Page 37

Advertising
background image

37

Maintenance & Repair

AH

PT

M

AM

B1

B

P

Air Power Pack Maintenance

Repair Power Train

1. Shut off tank valve (TV).

2. Disconnect two hoses (AH,HH)

from the power train (PT).

3. Disconnect the power train

from the power pack pallet by

removing two (2) bolts (B).

4. Remove two (2) bolts (B1) and

separate the air motor (AM)

from the Mount (M).

5. Refer to the air motor assembly

drawing for appropriate repair

or replacement. See Drawings

pg.64.

6. The rubber power coupling

insert (CI) between the air motor

and the hydraulic pump can now

be changed if neccessary. See

the next page.

7. Remove the hydraulic pump (P)

from the Mount (M).

8. Now the hydraulic pump (P)

can be repaired or replaced. See

drawings pg.66.

9. See the next page for informa-

tion on how to install the cou-

pler halves on the air motor and

hydraulic pump.

10. To install the hydraulic pump

TV

HH

NOTE

To order parts of the power pack assembly,

refer to page 68 in the drawings section.

Continued on next page.

Part Numbers

Part Name

Part #

Gear Pump Seal Kit

031-P05-1

Air Motor Repair Kit

031-P16-RK

Advertising