AMX Rough-In Box CB-TP10 User Manual

Cb-tp10, Installation guide, Specifications

Advertising
background image

Installation Guide

CB-TP10

Rough-In Box for 10" Wall/Flush Mount Touch Panels

Overview

The CB-TP10 Rough-In Box is an optional accessory for 10” Modero® Wall/Flush
Mount Touch Panels. The Rough-In Box allows the panel to be mounted directly to the
studs/pre-wall and includes a wall box and mounting screws.
Wall Mount panels (NXDs) are contained within a metallic outer housing (back box).
This back box is not removed when installing the NXD into a Rough-In Box. The back
box is only removed to gain access for the replacement of the Compact Flash
component or upgrade to the VESA housing.

Specifications

WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-IN
BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK.
This gap allows the installation of the drywall/sheetrock after the CB-TP10 has been
mounted onto the beams. The rough-in box installation must be done prior to any wall
installation.

Note: The most important thing to remember when mounting this rough-in box is that
the mounting tabs must be mounted flush against the outside of the sheetrock.
It is recommended that you cut out the surface slightly smaller than what is outlined in
the installation drawings so that you can make any necessary cutout adjustments.
The wiring knockouts on the left side will be used for the NXD-CV10 Wall Mount panel
connectors, so always secure the rough-in box to the stud using the Stud Mounting
Holes on the right side of the box.

Pre-Wall Installation of the CP-TP10 Rough-In Box

Refer to the SP225802 diagram for detailed installation dimensions (see

reverse).

Cutting out the surface slightly smaller than what is outlined in the installation

drawings, in order to make any necessary cutout adjustments, is highly
recommended.

The wiring knockouts on the left side will be used for the NXD-CV10 Wall Mount

panel connectors, so always secure the rough-in box to the stud using the Stud
Mounting Holes on the right side of the box.

1.

Rest the right Stud Mounting tabs onto the stud (keeping the knockouts on the
left). Be sure to leave enough of a gap between the stud and NXD Mounting tabs
to accommodate the installation of the drywall or sheetrock after the rough-in
box has been mounted. Ultimately, the Mounting Tabs should lie flush against
the outside of the sheetrock.

2.

Fasten the CB-TP10 rough-in box to the stud through the holes on the right Stud
Mounting tabs (FIG. 1), using either nails or screws.

3.

Remove the wiring knockouts from the left side of the CB-TP10 to accommodate
the cables being threaded through to the NXD touch panel.

Note: Remember that when mounting this rough-in box, the NXD mounting tabs must
lie flush against the outside of the sheetrock.
4.

Thread the incoming power, RJ-45 audio/video, Ethernet, and USB wiring
through the knockouts (use of the left wiring knockouts are recommended with
this installation). Leave enough slack in the wiring to accommodate any re-
positioning of the panel.

5.

Install the drywall/sheetrock before inserting the main NXD unit into the
CB-TP10.

CB-TP10 (FG036-10) Specifications

Dimensions (HWD) • 7 3/8" x 10 3/8" x 3 3/8"

• 18.7 cm x 26.4 cm x 8.6 cm

Included
Accessories

• 4 Phillips pan-head (#4-40 x 0.250 Black) screws

Certifications

• UL 508A

FIG. 1 CB-TP10 - Drywall Installation

Rough-In Box

Drywall

See reverse for

detailed dimensions

Do Not Use these

tabs to mount

the Rough-In Box

Front surface of

mounting tabs should

be flush with outside

face of drywall

Stud

Recommended Cutout for
CB-TP10 Rough-In Box

Advertising