Bryant 582A User Manual

Installation, start-up and operating instructions

Advertising
background image

NOTE:

Read the entire instruction manual before starting the

installation.

TABLE OF CONTENTS

SAFETY CONSIDERATIONS .....................................................1

INTRODUCTION ..........................................................................2

RECEIVING AND INSTALLATION ..........................................2

CHECK EQUIPMENT.............................................................2

IDENTIFY UNIT ................................................................2
INSPECT SHIPMENT ........................................................2
INSTALLATION ................................................................2

PROVIDE UNIT SUPPORT....................................................2

ROOF CURB.......................................................................2
SLAB MOUNT ...................................................................2
GROUND MOUNT ............................................................2

FIELD FABRICATE DUCTWORK........................................2
PROVIDE CLEARANCES ......................................................5
RIG AND PLACE UNIT .........................................................7
CONNECT CONDENSATE DRAIN ......................................7
INSTALL FLUE HOOD ..........................................................7
INSTALL GAS PIPING...........................................................8
INSTALL DUCT CONNECTIONS ......................................10

CONFIGURING UNITS FOR DOWNFLOW (VERTI-
CAL) DISCHARGE ..........................................................10

INSTALL ELECTRICAL CONNECTIONS .........................11

HIGH-VOLTAGE CONNECTIONS................................11
SPECIAL PROCEDURES FOR 208-V OPERATION ...12
CONTROL VOLTAGE CONNECTIONS .......................12
HEAT ANTICIPATOR SETTING...................................12
TRANSFORMER PROTECTION....................................12

PRE-START-UP ..........................................................................12

START-UP ...................................................................................14

CHECK FOR REFRIGERANT LEAKS ...............................14
START-UP HEATING AND MAKE ADJUSTMENTS......15

CHECK HEATING CONTROL.......................................15
CHECK GAS INPUT........................................................15
ADJUST GAS INPUT ......................................................15
CHECK BURNER FLAME..............................................19
AIRFLOW AND TEMPERATURE RISE.......................19
HEATING SEQUENCE OF OPERATION .....................19
LIMIT SWITCHES ...........................................................19
AUXILIARY LIMIT SWITCH (ROLLOUT)..................20

START-UP COOLING AND MAKE ADJUSTMENTS......20

CHECKING COOLING CONTROL OPERATION .......20
CHECKING

AND

ADJUSTING

REFRIGERANT

CHARGE ...........................................................................20
INDOOR

AIRFLOW

AND

AIRFLOW

ADJUST-

MENTS ..............................................................................21
COOLING SEQUENCE OF OPERATION.....................21

MAINTENANCE.........................................................................21

AIR FILTER......................................................................25
EVAPORATOR BLOWER AND MOTOR.....................25
FLUE GAS PASSAGEWAYS .........................................26
COMBUSTION-AIR BLOWER.......................................27
LIMIT SWITCH................................................................27

BURNER IGNITION ........................................................27
MAIN BURNERS .............................................................27
CONDENSER COIL, EVAPORATOR COIL, AND
CONDENSATE DRAIN PAN..........................................28
CONDENSER FAN ..........................................................28
ELECTRICAL CONTROLS AND WIRING ..................29
REFRIGERANT CIRCUIT...............................................29
GAS INPUT ......................................................................29
EVAPORATOR AIRFLOW .............................................29
METERING DEVICE — ACUTROL DEVICE .............29
LIQUID LINE STRAINER ..............................................29

TROUBLESHOOTING ...............................................................29

START-UP CHECKLIST............................................................29

NOTE TO INSTALLER — Before the installation, READ THESE
INSTRUCTIONS CAREFULLY AND COMPLETELY. Also,
make sure the User’s Manual and Replacement Guide are left with
the unit after installation. The furnace is NOT to be used for
temporary heating of buildings or structures under construction.

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment can be
hazardous due to system pressure and electrical components. Only
trained and qualified personnel should install, repair, or service
air-conditioning equipment.

Untrained personnel can perform basic maintenance functions of
cleaning coils and filters. All other operations should be performed
by trained service personnel. When working on air-conditioning
equipment, observe precautions in the literature, tags, and labels
attached to the unit, and other safety precautions that may apply.

Fig. 1—Unit 582A and 583A

(Low NO

x

Model Available)

A99338

Installation, Start-Up
and Operating Instructions

582A & 583A
SINGLE PACKAGED GAS HEATING/
ELECTRIC COOLING UNITS

Cancels:

II 582A-18-

4

II 582A-18-

5

11

-02

—1—

Advertising