Annually, Clean esp priming pump, Figure 5-2: primer pump parts overview – Hale ESP Priming System User Manual

Page 37: Figure 5-2, Primer pump parts overview

Advertising
background image

37

ESP Primer System Instruction Guide
p/n: 029-0810-01-0

M ain te n an ce

IMPORTANT !

IF LEAKS CANNOT BE DETECTED BY FOLLOWING THE PROCEDURE, IT IS
ADVISABLE TO TEST THE PUMP HYDROSTATICALLY. TO TEST:

OPEN ALL VALVES

PLACE CAPS ON ALL VALVES

CONNECT A POSITIVE PRESSURE SOURCE (TYPICALLY 250 PSI / 17 BAR)

INSPECT THE PUMP FOR LEAKS

Annually

Clean ESP Priming Pump

Disassemble the priming pump and inspect and clean the housing and vanes.
(See Figure 5-2: “Primer Pump Parts Overview.”)

Figure 5-2: Primer Pump Parts Overview

1.

Place apparatus out of service in accordance with your departmental
procedures.

2.

Park the vehicle on a level surface. Set the parking brake and chock the
front and rear wheels in accordance with your departmental procedures.

Advertising