J.P. Instruments EDM 960 Twin Primary Installation Manual User Manual

The owner of the edm-960 must keep this manual

Advertising
background image

FAA Approved Installation Manual for the EDM-960 Report No 909
Primary Engine Data Management System
Page 1 of 46 Rev D

Date 2-6-2014



TABLE OF CONTENTS

1.

Revisions _____________________________________________________________________________2

2.

Read This First ________________________________________________________________________2

3.

Instrument Marking_____________________________________________________________________3

4.

Primary TSO Label _____________________________________________________________________3

5.

Operation and Abbreviations_____________________________________________________________4

6.

Dimming______________________________________________________________________________5

7.

Locating and Installing the Indicator and Remote Alarm Display, RAD __________________________6

8.

EDM-960 Display Installation _____________________________________________________________7

9.

EDM-960 Key Card Installation ___________________________________________________________8

10.

EDM-960 in aircraft with wing-mounted engines _____________________________________________9

11.

EDM-960 in aircraft with centerline thrust engines __________________________________________10

12.

Wiring harness for 950 _________________________________________________________________11

13.

Wiring harness for Display _____________________________________________________________11

14.

Pressurized Aircraft wire Routing ________________________________________________________12

15.

Power Connection ____________________________________________________________________12

16.

Probe Wiring _________________________________________________________________________12

17.

Wiring Markings ______________________________________________________________________13

18.

Exhaust Gas Temperature Probe (EGT) Installation _________________________________________13

19.

Turbine Inlet Temperature (TIT) Probe Installation (optional) _________________________________14

20.

Cylinder Head Temperature (CHT) Probe Installation ________________________________________14

21.

Outside Air Temperature (OAT) Probe Installation __________________________________________15

22.

Compressor Discharge Temp Probe Installation (optional) ___________________________________15

23.

Carburetor Probe Installation (optional) ___________________________________________________15

24.

Oil Temperature Probe Installation _______________________________________________________15

25.

Oil Pressure Sensor Installation _________________________________________________________15

26.

Ammeter Shunt Installation _____________________________________________________________17

27.

General Fuel Flow Transducer Installation_________________________________________________18

28.

Fuel Level Interface Installation _________________________________________________________19

28.3

Fuel Tank Calibration __________________________________________________________________21

29.

Capturing the sender reading at each calibration point: _____________________________________22

30.

GPS Interface ________________________________________________________________________25

31.

Manifold Pressure (MAP) Sensor ________________________________________________________26

32.

RPM Sensor installation________________________________________________________________27

33.

EDM-960 system Specifications and Limitations____________________________________________28

34.

EMI Radio Test: _______________________________________________________________________29

35.

Component Parts List__________________________________________________________________30

36.

Weight and Balance Data _______________________________________________________________32

37.

Pilot Programming ____________________________________________________________________32

38.

Programming the K factor ______________________________________________________________35

39.

Trouble Shooting _____________________________________________________________________36

40.

Connector Pin Assignments EDM-950, J1 through J5 _______________________________________37

41.

P8 Harness Display PN 790807 __________________________________________________________43

42.

Interconnection between Display, DAU’s and GPS __________________________________________46

43.

Instructions for Continued Airworthiness (ICA) ___________________________________________46

The Owner of the EDM-960 must keep this manual

J.P. INSTRUMENTS

PO BOX 7033

HUNTINGTON BEACH CA

Last printed 5/8/2014 1:08:00 PM

Advertising