Lull 1044C-54 Series II Service Manual User Manual

Page 163

Advertising
background image

Boom and Transfer

31200079

6-21

Overhaul

Front Carriage Tilt
Cylinder

Fig. 6-12: Front Carriage Tilt Cylinder Assembly

(Ref. Fig. 6-12) The following steps are required to overhaul the front
carriage tilt cylinder.

1. Mount or support cylinder vertically with rod end down. Hydraulic oil in

cylinder will drain out during disassembly. Place a suitable pan or tray
under the cylinder.

2. Release oil pressure in the cylinder as follows:

MV0630

2

4

2

9

3

13

12

11

10

8

7

8

6

1

5

#

Description

1

O-ring Connector

2

Bushing

3

Set Screw

4

Grease Fitting

5

Counterbalance Valve Cartridge

6

Rod Nut

7

Cylinder Barrel

8

Bushing

9

Cylinder Rod

#

Description

10 Grease Fitting
11 Piston
12 Tube
13 Rod Bearing Head

Advertising