Lull 1044C-54 Series II Service Manual User Manual

Page 217

Advertising
background image

Boom and Transfer

31200079

6-75

Fig. 6-80: Rear Chain Roller Removal - Middle (Forward) Boom Section

27. (Ref. Fig. 6-80) Remove rear chain roller assembly as follows:

a. Remove capscrew (Item 6), lockwasher, (Item 5) and lock pin

(Item 4) from chain roller pin (Item 3).

b. Remove chain roller pin, two (2) chain guide washers (Item 7),

bushing (Item 8), chain roller (Item 9), and chain roller bushing
(Item 10).

28. Turn over inner boom section and place on work stands in upside down

position.

29. Remove front carriage tilt cylinder from inner boom (See page 6-19,

Steps 2–6).

J

1233

#

Description

1

Grease Fitting Cover

2

Grease Fitting

3

Chain Roller Pin

4

Lock Pin

5

Lockwasher

#

Description

6

Capscrew

7

Chain Guide Washer

8

Bushing

9

Chain Roller

10 Chain Roller Bushing

1

2

3

4

5

6

7

8

9

10

7

Advertising