Lull 1044C-54 Series II Service Manual User Manual

Page 236

Advertising
background image

Boom and Transfer

6-94

31200079

Fig. 6-99: Slide Pad Installation – Middle (Forward) Boom Section

Note: Apply thread locking compound to all slide pad mounting capscrews before

installing them.

18. (Ref. Fig. 6-99) Install shim pads on middle (forward) boom section as

follows:

a. Install bottom slide pad (Item 17) and shim(s) (Item 16) to rear of

boom section with two (2) lockwashers (Item 15) and capscrews
(Item 14) according to drawing specifications. Torque capscrews to
180 in-lbs.

b. Install two (2) side slide pads (Item 7) and shim(s) (Item 8) to rear

of boom section with two (2) each lockwashers (Item 12) and
capscrews (Item 11) according to drawing specifications. Torque
capscrews to 180 in-lbs.

19. (Ref. Fig. 6-99) Install bottom slide pads and shims on front of boom

section as follows:

13

MV0150

1

2

3

4

5

6

7

8

9

10

11

12

17

16

7

8

15

14

12

11

#

Description

1

Front Bottom Slide Pad

2

Shim

3

Pad Retainer

4

Flatwasher

5

Lockwasher

6

Capscrew

7

Side Slide Pad

8

Shim

9

Button-Head Socket Capscrew

#

Description

10 Lockwasher
11 Button-Head Socket Capscrew
12 Lockwasher
13 Middle (Forward) Boom Assy
14 Button-Head Socket Capscrew
15 Lockwasher
16 Shim
17 Rear Bottom Slide Pad